AQL calculator
Sample size and accept/reject numbers for critical, major and minor defects, from the ISO 2859-1 and ANSI/ASQ Z1.4 single sampling tables. With each plan's producer's risk, limiting quality and OC curve.
| Defects | AQL | Sample | Accept ≤ | Reject ≥ |
|---|---|---|---|---|
| Critical | Zero | 50 | 0 | 1 |
| Major | 2.5 | 50 | 3 | 4 |
| Minor | 4 | 50 | 5 | 6 |
Pull 50 pieces at random from the lot of 500 and count the defective pieces in each class. Any critical defect rejects the lot. Major: accept with 3 or fewer, reject at 4. Minor: accept with 5 or fewer, reject at 6. The lot passes only if every class passes.
Operating characteristic (OC) curve
The chance each plan accepts a lot, by how defective the lot really is. Dashed lines mark each AQL; dots mark the limiting quality (accepted only 10% of the time).
Learn more
All guides →How to choose an AQL for receiving inspection
Classify defects as critical, major or minor, pick an AQL and inspection level for each, and know when zero-acceptance (c = 0) plans are required.
Read the guide →Normal, tightened and reduced inspection: the switching rules
When to move a supplier's part from normal to tightened or reduced inspection and back, under ANSI/ASQ Z1.4 and ISO 2859-1, and when to stop accepting lots.
Read the guide →Skip-lot inspection: a practical guide to ISO 2859-3
How to qualify a supplier's part for skip-lot, how often to inspect, and what interrupts or ends skip-lot, with the records auditors expect.
Read the guide →Stop looking it up for every lot
SkipLot QC works out the plan for each shipment at the dock, applies the switching rules, and lets proven parts skip inspection. 30-day free trial.
How to use it: a worked example
A shipment of 2,000 housings arrives. You inspect at general level II with zero tolerance for critical defects, AQL 2.5 for major and 4.0 for minor.
- Code letter. 2,000 pieces falls in the 1,201 to 3,200 row; at level II that is letter K.
- Sample size. Letter K means a sample of 125.
- Accept and reject numbers. At K: major AQL 2.5 gives accept 7, reject 8; minor AQL 4.0 gives accept 10, reject 11. Critical: any defect rejects.
- Inspect and decide. Pull 125 housings at random. Finding 1 critical defect rejects the lot. Otherwise, 8 or more major defectives reject it, as do 11 or more minor ones. If every class is within its accept number, the lot passes.
Open this example in the calculator.
Questions
Switching between normal, tightened and reduced
Start with normal inspection. Switch to tightened when 2 of 5 or fewer consecutive lots are rejected, and back to normal after 5 consecutive lots are accepted on tightened. Move to reduced inspection only after a sustained run of good lots (ISO 2859-1 uses a switching score of 30), with steady production and the responsible authority's approval; go back to normal as soon as a lot is rejected. If the number of lots rejected on tightened inspection reaches 5, stop accepting product under the plan until the supplier has improved. ISO 2859-1:2026 adds skip-lot as a further step for suppliers with an excellent record.
About these tables
Single sampling plans from MIL-STD-105E (public domain), which ANSI/ASQ Z1.4 reproduces and which match ISO 2859-1 for normal and tightened inspection. Producer's risk and limiting quality are calculated with the binomial distribution. Always confirm the plan your quality system, contract or customer specifies. See the full AQL tables.