Receiving inspection glossary
The terms you'll meet in ISO 2859, ANSI/ASQ Z1.4, supplier quality and audits, in plain English.
- 8D
- Eight disciplines: a structured problem-solving method for corrective action.
- Acceptance number (Ac)
- The most defective pieces a sample can contain for the lot to be accepted.
- AQL (acceptance quality limit)
- The worst tolerable process average, in percent defective, for a series of lots. It selects the sampling plan. Formerly "acceptable quality level".
- Certificate of conformance (CoC)
- The supplier's signed statement that a shipment meets the purchase requirements.
- Code letter
- The letter (A to R) from Table I that combines lot size and inspection level, and selects the sample size.
- Consumer's risk
- The probability that a lot at the consumer's risk quality is accepted, usually 10%.
- Consumer's risk quality (CRQ)
- The quality level a plan accepts only with the consumer's risk, usually 10%; ISO 2859-1 tabulates it. Often called limiting quality (LQ), the term ISO 2859-2 uses for isolated lots.
- Critical defect
- A defect likely to cause hazardous or unsafe conditions, or to stop the product performing its function (ANSI/ASQ Z1.4).
- Disposition
- The decision for nonconforming material: return to supplier, rework, repair, use as is or scrap.
- First article inspection (FAI)
- A complete inspection of the first production part against every design requirement; in aerospace, per AS9102.
- Inspection level
- Sets the relative sample size: general levels I, II (default) and III, and special levels S-1 to S-4 for small samples.
- Lot
- A quantity of product made under the same conditions and submitted for inspection together, usually one shipment line of one part.
- Major defect
- A defect likely to cause failure or materially reduce usability.
- Minor defect
- A departure from standard unlikely to reduce usability.
- MRB
- Material review board: the group that decides what to do with nonconforming material.
- Normal inspection
- The starting severity, used unless the switching rules call for tightened or reduced.
- OC curve
- The operating characteristic curve: probability of acceptance against the lot's true percent defective.
- PPAP
- Production part approval process (AIAG): the automotive supplier's evidence that the process makes conforming parts at rate.
- PPM
- Parts per million defective: defective pieces ÷ pieces inspected × 1,000,000.
- Producer's risk
- The probability that a lot is not accepted when its quality is at the AQL.
- Reduced inspection
- Inspection with smaller samples, allowed after a sustained run of accepted lots, with approval.
- Rejection number (Re)
- The number of defective pieces in the sample at which the lot is rejected.
- SCAR
- Supplier corrective action request: a formal request that a supplier investigate and correct a nonconformance, often using 8D.
- Skip-lot frequency
- The fraction of lots inspected on skip-lot, from 1 in 2 to 1 in 5.
- Skip-lot inspection
- Inspecting only a random fraction of lots of a qualified part, as in ISO 2859-3, ISO 2859-1:2026 or ANSI/ASQ S1.
- Switching rules
- The rules in ISO 2859-1 and ANSI/ASQ Z1.4 for moving between normal, tightened and reduced inspection, and for discontinuing it.
- Switching score
- ISO 2859-1's running score for deciding when to move from normal to reduced inspection (at 30 points).
- Tightened inspection
- Inspection with lower accept numbers, used after 2 of 5 or fewer consecutive lots are rejected.
- Use as is
- Accepting nonconforming material without rework; usually needs a documented concession.
- Zero acceptance (c = 0)
- A plan that accepts a lot only if the sample has no defectives; required by IATF 16949 and used in AS9138.
Want the detail? Read the guides on choosing an AQL, switching rules and skip-lot inspection.