Skip to content
ISO 2859-3 · receiving inspection

Skip-lot inspection software

Decide lot by lot which incoming shipments to inspect and which to skip, with ISO 2859-3 rules your auditors will sign off. SkipLot QC qualifies parts automatically, picks lots at random, puts parts back on inspection when the risk changes, and keeps every decision on record.

30-day free trialNo credit cardWorks with your ERP
Qualification

Parts earn skip-lot from their own history: 10+ consecutive accepted lots and an ISO 2859-3 qualification score, with an eligibility checklist that cites each clause.

Random selection

Each lot of a qualified part gets a random draw at 1 in 2 to 1 in 5. The draw is recorded, so nobody can predict which lot gets checked.

Automatic interruption

A rejected lot, an open SCAR, a new revision or an unqualified supplier sends the part back to inspection immediately.

Audit trail

Every skip or inspect decision, its reason, the qualification history and each frequency change are kept with the lot.

At the dock

A skip or inspect decision on every line

Receivers scan the PO and see, per line, whether to inspect, why, and how many pieces to pull. Skipped lots still get the dock checks: right part and revision, quantity, packaging and paperwork.

  • Reasons on screen: "Random skip-lot selection, 1 in 4", "Open corrective action", "Revision isn't current".
  • Sample size for the quantity received, from ISO 2859-1 with switching rules, for the lots that are inspected.
  • Plan ahead: the Inspection Plan shows decisions for open PO lines before they arrive.
The rules

ISO 2859-3, run for you, part by part

  • Eligibility checklist: qualified supplier, stable design, no critical characteristics, general inspection level, never on tightened inspection during qualification. Each item cites its clause.
  • Qualification score kept per part and supplier, and approval by the responsible authority logged.
  • Frequency starts at 1 in 2, 1 in 3 or 1 in 4 depending on how quickly the part qualified, and moves toward 1 in 5 while results stay good.
  • Interruption and requalification within 4 to 6 lots, and disqualification if it fails.
  • Critical and key characteristics are never skipped. Aerospace and automotive profiles add first article, PPAP and zero-acceptance rules.
  • Simple skip cycle on every plan, for shops that want "inspect a few, then skip a few".
Why software

Skip-lot on a spreadsheet is hard to defend

Most teams that try skip-lot by hand end up inspecting everything again, or skipping without the evidence an auditor asks for.

Spreadsheet or manual logSkipLot QC
Decision for each lot at the dockSomeone looks it up, if they rememberOn the receiving screen, with the reason
QualificationCounted by hand, often just "5 good lots"ISO 2859-3 score and checklist, per part and supplier
Which lots get inspectedEvery 3rd or 4th, which is predictableRandom draw, recorded with the lot
When something goes wrongRelies on someone updating the sheetAutomatic: failed lot, open SCAR, new revision, supplier status
Lots that are inspectedSample size looked up in a tableISO 2859-1 plan for the quantity, with switching rules
Audit evidenceScattered across files and emailsEvery decision, reason and change in one history

Already have an ERP quality module? Many can skip lots once configured. SkipLot QC sits alongside it: import your open POs, and receivers and inspectors get the skip-lot decisions, sampling plans and records in one place, without consultant configuration.

What it saves

Inspect 1 lot in 2 to 1 in 5 on proven parts

Inspectors spend their time on new parts, new suppliers and problem parts instead of re-checking the ones that always pass. Work out what that's worth at your receiving volume.

Questions

Skip-lot inspection software: common questions

Start skipping the lots that have earned it

Import your open POs and see skip or inspect decisions the same day. 30-day free trial, every feature included.