AQL tables
The sample size code letters and single sampling plans for normal, tightened and reduced inspection, as in ANSI/ASQ Z1.4 and ISO 2859-1. Click any plan to open it in the AQL calculator.
1. Sample size code letters
Find the row for your lot size and the column for your inspection level. General level II is the default.
| Lot size | S-1 | S-2 | S-3 | S-4 | I | II | III |
|---|---|---|---|---|---|---|---|
| 2 to 8 | A | A | A | A | A | A | B |
| 9 to 15 | A | A | A | A | A | B | C |
| 16 to 25 | A | A | B | B | B | C | D |
| 26 to 50 | A | B | B | C | C | D | E |
| 51 to 90 | B | B | C | C | C | E | F |
| 91 to 150 | B | B | C | D | D | F | G |
| 151 to 280 | B | C | D | E | E | G | H |
| 281 to 500 | B | C | D | E | F | H | J |
| 501 to 1,200 | C | C | E | F | G | J | K |
| 1,201 to 3,200 | C | D | E | G | H | K | L |
| 3,201 to 10,000 | C | D | F | G | J | L | M |
| 10,001 to 35,000 | C | D | F | H | K | M | N |
| 35,001 to 150,000 | D | E | G | J | L | N | P |
| 150,001 to 500,000 | D | E | G | J | M | P | Q |
| 500,001 and over | D | E | H | K | N | Q | R |
2. Single sampling plans: reduced inspection
Each cell is Ac / Re: accept with Ac or fewer defectives in the sample, reject at Re. An arrow means there is no plan at that letter: follow it to the first plan below (↓) or above (↑), and use that plan's sample size. Reduced plans are the ANSI/ASQ Z1.4 (MIL-STD-105E) ones; between Ac and Re, accept the lot but return to normal inspection. ISO 2859-1 has used reduced plans without that gap since 1999.
| Letter | Sample | 0.01 | 0.015 | 0.025 | 0.04 | 0.065 | 0.1 | 0.15 | 0.25 | 0.4 | 0.65 | 1 | 1.5 | 2.5 | 4 | 6.5 | 10 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | 2 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ |
| B | 2 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ |
| C | 2 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 |
| D | 3 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 |
| E | 5 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 |
| F | 8 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 |
| G | 13 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 |
| H | 20 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 |
| J | 32 | ↓ | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 |
| K | 50 | ↓ | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 |
| L | 80 | ↓ | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ |
| M | 125 | ↓ | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ | ↑ |
| N | 200 | ↓ | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ | ↑ | ↑ |
| P | 315 | ↓ | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ | ↑ | ↑ | ↑ |
| Q | 500 | 0 / 1 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ | ↑ | ↑ | ↑ | ↑ |
| R | 800 | ↑ | ↓ | 0 / 2 | 1 / 3 | 1 / 4 | 2 / 5 | 3 / 6 | 5 / 8 | 7 / 10 | 10 / 13 | ↑ | ↑ | ↑ | ↑ | ↑ | ↑ |
AQL in percent nonconforming (up to 10). The standards' columns above 10 count nonconformities per hundred units and are left out here.
Learn more
All guides →How to choose an AQL for receiving inspection
Classify defects as critical, major or minor, pick an AQL and inspection level for each, and know when zero-acceptance (c = 0) plans are required.
Read the guide →Normal, tightened and reduced inspection: the switching rules
When to move a supplier's part from normal to tightened or reduced inspection and back, under ANSI/ASQ Z1.4 and ISO 2859-1, and when to stop accepting lots.
Read the guide →Let the software read the table
SkipLot QC picks the plan for every shipment, tracks the switching rules per part and supplier, and skips inspection for proven parts. 30-day free trial.
How to read the AQL table
- Look up your lot size in table 1 to get the code letter (level II unless your plan says otherwise).
- In table 2, go to that letter's row and your AQL's column.
- If the cell has numbers, they are your accept and reject numbers, and the row gives the sample size.
- If it has an arrow, move in its direction to the first cell with numbers, and use that row's sample size. If the sample is as large as the lot, inspect every piece.
Sources
Values from MIL-STD-105E (1989), which is in the public domain. ANSI/ASQ Z1.4 reproduces these tables, and ISO 2859-1 has the same normal and tightened single sampling plans. ISO 2859-1:2026 (third edition) reorganizes the standard and adds skip-lot to the switching rules; check your copy of the standard you work to, as this page isn't a substitute for it.